- Creating a clean room for an ATHM
- Location: Haute-Savoie (74)
- Partitions: 400 m² of rock wool panels installed
- Ceilings: 200 m² of Nida panels installed
- Special feature: installation of double hangers to take up the FFU ceiling below the Nida ceiling.