- Construction of a logistics building with temperature-controlled receiving dock.
- Location: Val d'Oise (95)
- Use of QUADCORE panels (reaction to fire) and cleanroom panels in
honeycomb. - Independent structure required with MULTIBEAM system to support
cleanrooms.