Une salle propre

Fitting out a logistics building

  • Construction of a logistics building with temperature-controlled receiving dock.
  • Location: Val d'Oise (95)  
  • Use of QUADCORE panels (reaction to fire) and cleanroom panels in
    honeycomb.
  • Independent structure required with MULTIBEAM system to support
    cleanrooms.