- Construction of a 1,800m² central kitchen for over 4,000 meals/day
- Location: Rhône (69)
- Site duration: more than 6 months
- Expertise in temperate environments, thermal bridge treatment and inter-lot coordination
- 6 panel references and 8 door references used to meet all
technical and aesthetic requirements.