Une salle propre

Municipality's central kitchen

  • Construction of a 1,800m² central kitchen for over 4,000 meals/day
  • Location: Rhône (69)
  • Site duration: more than 6 months
  • Expertise in temperate environments, thermal bridge treatment and inter-lot coordination
     
  • 6 panel references and 8 door references used to meet all
    technical and aesthetic requirements.