- Creation of a large kitchen for a school group
- Location: Puy de Dôme (63)
- Installation of 750 m² of PIR insulated panels, 6.50 m² of negative ground panels,
- Installation of 1 negative isothermal revolving door, 3 positive doors, 12 semi-isothermal doors, 2 polyethylene to-and-fro doors, 7 fixed PVC frames, 1 pressure relief valve, 230 ml of protective rails, protective corners, PVC skirting boards.